We have been in business for a long time, financially secure, and proud of our excellent client relationships, which generate continued repeat business.

Our reputation is built on consistently producing high quality work safely, on time and to budget. Our companies expertise stem from our loyal, long serving dedicated staff to provide the resources and commitment to help you achieve a successful and profitable development within the timescales and budget.

Boxed Culvert

Four-sided concrete culverts, commonly referred to as box culverts, are some of the most versatile precast concrete products on the market. Box culverts are suitable for applications such as underpasses, tunnels, subways, bridges, stream culverts, material handling, storage, and more.

Land Surveys

A land survey involves locating and measuring both man-made and natural features using the principles of mathematics, geometry, and other sciences. By using various tools, a land surveyor can measure things such as elevation, angles, and boundaries on a property.

Soil Reports

Depending on site conditions, a soils report may identify expansive soils, high water tables, shifts in subsurface rock structures, as well as the soil's response to earthquakes. It may also guide the design team in planning deep foundations.

Site Clearance

Site clearance, also known as land clearance, is the removal of all accumulated waste from an area to ensure that it's free from any hazards, obstacles or unsightly mess. This service is often employed when a worksite needs to be prepared for future development or when a previous development has been pulled down.

Tree Protection

Heris fencing is erected at the canopy of the tree to protect the roots from damage.

Bulk Excavations

Bulk excavations involve the removal of large amounts of soil, rock, or other material from site, in preparation for a construction project. Excavations are often required for residential or commercial projects to bring the land to the right level to build foundations and structures on.

Concrete Crushing

Crushing is the process of reducing the size of materials so that they can be further processed. ... Having smaller pieces of the material allows for easier transportation, further processing, and/or better ability to differentiate the different compositions of the material.

Infrastructure

Providing roads, Surface Water & foul Drainage and attendance on combined services.

Groundworks

Covering site clearance, installation of footings and foundations including provisions for drainage and utilities and landscaping afterwards.

Piling

Inserting large amounts of wood, steel or concrete into the soil of the ground. The deep insertion of these elements ensures a sturdier base for the construction project to take place.

Ground Beams

The purpose of the ground beam is to link the piles together and provide a platform for further superstructure construction. Excavation work is carried out immediately or a short while after the completion of the piling work and are excavated to the engineers specification and to the level supplied by the client.

Underpinning

Underpinning is the process of providing extra support underneath a building to stop it subsiding into the ground

Land Remediation

Land remediation is the process by which land resources are restored to their former state or “baseline condition”. ... Remediation involves land management practices which can remove, control, contain or reduce environmental risks, so that the site no longer poses any significant threat to human health or the environment.

Dewatering

Dewatering involves the temporary lowering of groundwater level to below an excavation level or depressurisation of groundwater pressures to enable an excavation to be undertaken in stable ground conditions. Other commonly used terms are Construction Dewatering or Groundwater Control.

Pumping Stations

Water pumping stations are machines that can be used to transport water from one site to another, without needing direct human or animal input. These devices can supply water to canals, circulate water in treatment systems and can even drain water from low lying land.

Temporary Works & Shoring

Temporary works are the parts of a construction project that are needed to enable the permanent works to be built. Usually the Temporary Works are removed after use. Shoring refers to constructing a temporary structure that would serve as lateral support to an unstable structure.

Traffic Management

Road traffic management is a logistics sector that relates to traffic from one place to another, with scheduling and monitoring in the safest, most efficient way. Accommodating traffic in a secure and effective manner to decrease or eliminate crashes is one of the primary problems of highway traffic management.

Reinforced In Situ Concrete Frames

Reinforced concrete is a versatile composite and one of the most widely used materials in modern construction. ... Reinforced concrete can be precast or cast-in-place (in situ) concrete, and is used in a wide range of applications such as; slab, wall, beam, column, foundation, and frame construction.

Substructure Brickwork

Substructure brickwork involves the construction of brickwork below ground height at foundation level, and is a vital part of stabilising a building and giving the overall structure strength.

Power floated concrete floors

A power float is a hand-operated machine used to produce a smooth, dense and level surface finish to insitu concrete beds. Power floating eliminates the time and materials needed to apply a finishing screed and is quicker and less labour-intensive process than hand trowelling.

Tarmac

Tarmacking is used as surface finish on roads, footpaths, driveways.

Block Paving

Block paving is a type of cuboid-shaped paving brick, specifically made for driveways. It is thicker and stronger than normal paving slabs so it can withstand the weight of vehicles.

Block and Beam Flooring

The traditional beam and block flooring system involves laying precast, prestressed concrete floor beams across or between walls which are then infilled with concrete blocks. ... This dry construction method can be used to produce high-quality economic ground and upper floors in residential and other building types.

Services

Our blend of expertise, resources and commitment helps you achieve a successful and profitable development within timescales and to budget.

We relish the challenges of building on brownfield land, assessing sites, formulating proposals, calculating costs and carrying out remediation works. We select the means that best suit the individual nature of the project, using innovative techniques and the latest equipment, handled by experienced, trained personnel.

We are aware of the changing environmental legislation and pay the closest attention to all environmental issues.

Case Studies

North Whiteley Infrastructure

Client: Vistry Bovis

Value: £7million

North Whiteley is a major development area with potential to create 3,500No. New Homes within the existing landscape. Large areas of retained woodland and open space are used to benefit the overall scheme.

Together with 2 new primary schools, a secondary school, retail and community centre. Major highway improvements to enhance access in and around the new development.

  • 10,000m² of Road Construction
  • Foul & Surface Water Sewers
  • Culverts
  • Pump Stations
  • Balancing and Retention Ponds
  • Mains Services
  • Footpaths
  • Public Open Space

North Whiteley Meadows

Client: Vistry Bovis – PH10

Value: £4.20million

Construction of 90No. Plots

2, 3 & 4 Bedroom Houses

  • 7,500m² of Estate Roads & Car Parking
  • Foul & Surface Water Sewers
  • Mains Services
  • Foundations
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork
  • External Works

Chichester Infrastructure

Client: Linden/Miller Homes

Value: £6.30million

White House Farm is to the west of Chichester with the potential to deliver 1600 homes in a mixed use development.

Providing employment land, primary school, local centre and Country Park.

Works included S278 on the Old Broyle Road and the formation of swales, retention ponds and extensive culvert works.

  • S278 Works
  • 8,000m² of Road Construction
  • Foul & Surface Water Sewers
  • Culverts
  • Retention Ponds – Swales
  • Mains Services
  • Public Footpaths 
  • Country Parks

Chichester Minerva Heights

Client: Vistry Linden/Bovis Homes – PH2B & PH3C

Value: £11million

Construction of 275No. Plots

3, 4 & 5 Bedroom Houses

1 & 2 Bedroom Apartments

  • 14,000m² of Road Construction
  • 10,000m² of Car Parking
  • Foul & Surface Water Sewers
  • Mains Services
  • Foundations
  • Ground Beams
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork
  • Retaining Walls

Crawley Infrastructure

Client: Persimmon/Taylor Wimpey

Value: £38.50million

Forgewood is to the North East of Crawley Town. When complete in 2026, it will provide a new neighbourhood for 1900 homes with primary school, community centre, offices, industrial and retail space with parkland and outdoor amenity areas.

Our works included the Construction of extensive S278 works in Steers Lane, Balcombe Road and Radford Road.

Together with the construction of Infrastructure estate roads to facilitate the development for the 1900 new homes.

  • S278 Works
  • 51,000m² of Road Construction
  • Foul & Surface Water Sewers
  • Pump Stations
  • Headings – Tunnelling – Boring 
  • Public Open Space – Community Areas

Crawley Forgewood

Client: Persimmons & Charles Church PH1, PH2, PH3

Value: £22million

Construction of 625No. Plots

2, 3, 4 & 5 Bedroom Houses 

1 & 2 Bedroom Apartments

  • 8,900m² of estate road construction 
  • Foul & Surface Water Main Services
  • Mains Services
  • Foundations
  • Ground Beams
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork
  • External Works

Billingshurst Bypass & Infrastructure

Client: Persimmon/Bellway/Devine Homes

Value: £11million

Construction of a new link road to bypass Billingshurst Town Centre.

The 1.1km spine road links the A272 to A29 to the east of the town.

  • S278 Works
  • 18,000m² of Road Construction
  • Foul & Surface Water Drainage
  • Pump Stations
  • Public Open Space

Hammonds Farm

Client: Persimmons & Charles Church Phase 4/2/1

Value: £9.6million

Construction of 194No. Plots

2, 3 & 4 Bedroom Houses 

1 & 2 Bedroom Apartments

  • 15,500m² of estate road construction 
  • Foul & Surface Water Main Sewers
  • Mains Services
  • Foundations
  • Ground Beams
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork
  • External Works

Billingshurst Amblehurst Green

Client: Bellway Phase 5/10/11

Value: £8.40million

  • 142 No Plots – a mixture of 2, 3 & 4 Bedroom Houses
  • 13,200m² of Road Construction & Parking
  • Foul & Surface Water Sewers
  • Mains Services
  • External Works
  • Balancing Ponds & Open Space
  • Foundations
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork

Deepcut Camberley Midenhurst

Client: Vistry Bovis Homes

Value: £4.6million

  • 127 No Plots – 1 & 2 Bed Apartments 

                           2, 3, 4 & 5 Bed Apartments

  • 7,000m² of Road & Carpark Construction
  • Foul & Surface Water Sewers
  • Traditional & Piled Foundations
  • Ground Beams
  • Main Services
  • Oversites
  • Domestic Drainage
  • Sub Structure Brickwork
  • External Works

Winnersh Wokingham Infrastructure

Client: Persimmon/Vistry Bovis Homes

Value: £3.5million

  • 14,000m² of Spine Road Construction
  • Foul & Surface Water Sewers
  • Pump Station
  • Balancing & Retention Ponds
  • Public Open Space
  • Mains Services

Winnersh Wokingham Hatchwood Mill

Client: Persimmon Homes

Value: £9.10million

  • 246 No Plots – 2, 3, 4 & 5 Bedroom House
  • 5,000m² of Road and Carpark Construction
  • Foul & Surface Water Sewers
  • Mains Services
  • Traditional & Piled Foundations
  • Ground Beams
  • Oversites
  • Domestic Drainage
  • Substructure Brickwork
  • External Works
  • Public Open Space